Quote-Ready Now Licensed & Insured
Framing Guide

Mississauga Second Units and Additions: Permits 2018 to 2025

Our analysis of City of Mississauga permit data counts 4,234 residential second unit permits from 2018 to 2025 and shows which wards and years drove the work.

Mississauga Second Units and Additions: Permits 2018 to 2025, framing work completed by Timberr Framing in the GTA

Our analysis of City of Mississauga building permit data counts 4,234 residential permits for second units and additional residential units issued from 2018 to 2025. That is about three times the 1,362 permits for new detached, semi-detached and row dwellings in the same years, and the yearly count peaked at 775 in 2024.

If you own a detached or semi-detached house in Mississauga, those numbers show where the framing work is: inside existing homes, not on empty lots. Our second suite and in-law suite framing crews work on exactly these conversions, and the sections below set out what the permits show and what the City asks for.

How many second unit permits does Mississauga issue each year?

The count grew from 213 permits in 2018 to 775 in 2024, about 3.6 times as many, then fell to 631 in 2025, a drop of roughly 19 per cent. Additions and new low-rise dwellings stayed in a narrow band over the same period.

Residential building permits issued in Mississauga by year, 2018 to 2025. Source: our analysis of City of Mississauga building permit data, downloaded 7 November 2026.
Year issuedSecond units and additional residential unitsAdditions to existing homesNew detached, semi-detached and row dwellings
2018213167210
2019300157171
2020435126165
2021509181150
2022650182181
2023721173199
2024775130163
2025631142123
All eight years4,2341,2581,362

Additions ranged from 126 to 182 permits a year, and new dwellings from 123 to 210. By 2025 there were about five second unit permits for every new-dwelling permit (631 against 123). The data records permits, not the reasons owners applied, and we did not test any explanation for the rise or the 2025 dip.

Which wards have the most second unit permits?

Four wards hold two thirds of the work. Ward 10 had 899 of the 4,234 permits (21.2 per cent), followed by ward 11 with 696, ward 6 with 686 and ward 5 with 527. Together those four wards had 2,808 permits, or 66.3 per cent.

Second unit and additional residential unit permits issued in Mississauga by ward, 2018 to 2025. Source: our analysis of City of Mississauga building permit data, downloaded 7 November 2026.
WardPermitsShare
11343.2%
21413.3%
31062.5%
42305.4%
552712.4%
668616.2%
71914.5%
82997.1%
93257.7%
1089921.2%
1169616.4%

Wards 1, 2 and 3 together had 381 permits, or 9.0 per cent. A neighbourhood group or a reporter can quote the contrast directly: ward 10 alone had more second unit permits than wards 1 to 4 combined (899 against 611).

We do not name streets or neighbourhoods, and the data does not tell us why the work clusters. Housing age and lot type vary a lot across the city, so treat the map as a description of where permits were issued, not a forecast of where your own project will be easiest.

What does Mississauga allow on a lot?

Timberr Framing crews framing on site in the Greater Toronto Area

The City says an owner of a detached, semi-detached or town home property can build up to two additional residential units, or a fourplex. The City’s page on building more units on your property names the Additional Residential Unit By-law (0174-2023) and the Fourplex By-law (0196-2023) as the zoning rules.

Each unit must be self-contained, with cooking, living, sleeping and washroom facilities. A building permit is required, and the application goes in through the City’s ePlans system with a site plan, design drawings and the applicable forms. Which option fits your lot depends on zoning, so check your property in the City’s property information tool before you pay for drawings.

The same City page describes pre-approved garden suite plans, limited to one-bedroom or studio units. A detached suite is a different framing job from a basement conversion, and our garden suite framing page covers it.

What does the City want to see on the drawings?

For a conversion, the City lists an Applicable Law Form, an Application to Register a Second Unit and a Schedule 1 Designer Information form, plus water service pipe sizing when there are three or more units. Drawings must be to scale and use metric measurements.

Framers care most about the floor plan requirements. The City asks for structural framing details (size, type, grade, spacing, span direction and the location of studs, joists, beams, columns, posts and lintels), a legend showing which walls stay, which come out and which are new, smoke alarm and carbon monoxide detector locations, and plumbing fixture locations. If the work touches the outside, it also asks for elevations with window and door sizes and the glazed area calculation.

A designer who leaves any of that off causes a round of comments, and every round delays the day the frame can start. Our notes on when you need a structural engineer for framing explain which changes need stamped drawings.

What does the Ontario Building Code require inside a second unit?

The province’s guide to adding a second unit sets the main numbers. A basement unit needs a ceiling height of 1.95 m over the required floor area, including the route to the exit. The Building Code requires a 30-minute fire separation between units and between a unit and common areas, which can drop to 15 minutes if the whole house has interconnected smoke alarms.

The Ontario guide to adding a second unit also covers exits and alarms. A basement escape window needs at least 0.38 square metres of unobstructed opening, an openable portion of 460 mm or more, and a sill no higher than 900 mm above the floor or steps. Smoke alarms go on every level, outside sleeping areas, in each bedroom of the second unit and in shared spaces, with carbon monoxide alarms where the house has a fuel-burning furnace or an attached garage. The page itself warns that some content may not reflect recent changes, so confirm current requirements with the City.

For a framer, those rules decide wall thickness, ceiling drops, stair openings and where the new window goes. Our guide to legal second suite framing and code requirements walks through the framing side in more detail.

How do the inspections work in Mississauga?

Timberr Framing crews framing on site in the Greater Toronto Area

You book inspections online through the City of Mississauga’s online booking page using the permit application number and the WEB ID on your permit notice. Inspections run Monday to Friday, 8:30 a.m. to 4:30 p.m.

Inspection order for a Mississauga second unit, from the City's inspection page.
StepWhat the City says
Rough-insPlumbing, electrical and HVAC rough-ins must pass before the framing inspection
FramingBook once all framing and electrical work is complete; insulation cannot go in until it passes
What is checkedCeiling heights, room dimensions, layouts and window sizes match the approved drawings; firestopping and fire blocks in concealed spaces; smoke alarm and carbon monoxide rough-ins complete; an approved gasket between wood and the basement floor
Fire separationAfter framing, sound insulation, and plumbing and heating rough-ins, and before drywall
FinalLast, once all work and earlier deficiencies are done

The City’s own list of required inspections for your project is confirmed at the initial site inspection. For fire inspections, the Fire Prevention office takes bookings by email at [email protected].

How do you register the unit once it is built?

All second units must meet the Ontario Building Code, the Ontario Fire Code and the zoning by-law, and must be registered with the City. There is no fee to register. Email [email protected] with proof of ownership, a copy of the building permit signed off by all inspectors, and the completed registration form.

Registered units are added to the Second Units Registry List, which the City updates in the second week of every month. To report a unit that is not on the list, call 311, the City of Mississauga service line.

What should you have ready before calling a framer?

A framer can give a firm start date and scope when these are in hand:

  • Permit drawings, or the near-final set, with the structural framing details the City asks for
  • The ceiling height measured at the lowest beam, duct and bulkhead, not just the open floor
  • The location of the escape window and any lowered sill or window well
  • The stair and exit plan, including any separate side or rear entrance
  • The plumbing and HVAC rough-in schedule, since those inspections come before framing
  • The fire separation assembly shown on the drawings, so wall and ceiling build-ups are framed once

If you are comparing a basement conversion with a larger project, our basement framing in Mississauga and home addition framing pages show how each is scoped. For a full second suite, start with second suite framing in Mississauga.

How we counted

Timberr Framing crews framing on site in the Greater Toronto Area

We used the City of Mississauga’s Building Permits data set, downloaded on 7 November 2026 through the City’s public data service, which held 35,390 records issued from January 2018 to October 2026.

  • Period: issue date from 1 January 2018 to 31 December 2025, whole years only. 2026 is not complete, so it is not shown.
  • One count per permit: each permit number was counted once, and revoked permits were excluded.
  • Residential only: file type Residential.
  • Second units: permits whose application detail is Second Unit, Basement Apartment or Additional Residential Units. The City’s data used the label Second Unit up to 2023 and Additional Residential Units from 2024, so we combined them. Permits that only mention a second unit in free text, mostly revisions to earlier permits, were not counted.
  • Additions: scope Addition to Existing Building or Addition and Alteration, excluding any permit already counted as a second unit.
  • New dwellings: scope New Building with a detached, semi-detached, row, street row or condominium row dwelling type, excluding second unit permits. One permit can cover several row units.
  • Wards: the ward recorded on each permit.
  • Checked twice: every number was computed with two separate methods, a Python count and an SQL recount, and the results matched exactly.
  • Limits: the data records what the City issued, not what was built. The City updates it, so later downloads may differ. We used only counts, with no names, addresses, permit numbers or cost fields.

Data: City of Mississauga Open Data, Building Permits, used under the City’s open data terms.

If you are planning a basement apartment or a garden suite, start with our second suite and in-law suite framing page.

Frequently asked questions

How many second unit permits did Mississauga issue from 2018 to 2025?

Our analysis of City of Mississauga building permit data counts 4,234 residential permits for second units and additional residential units issued in those eight years. The yearly count rose from 213 in 2018 to a peak of 775 in 2024, then fell to 631 in 2025.

Do I need a building permit for a basement apartment in Mississauga?

Yes. The City of Mississauga says a building permit is required to build new units, and applications go in through its ePlans system. A basement unit also has to be registered with the City once the permit is signed off by all inspectors.

Does it cost anything to register a second unit in Mississauga?

The City says there is no fee to register a second unit. You still pay for the building permit, any fire inspection fees and the design and construction work. Registration is done by email to [email protected] with proof of ownership, the signed-off permit and the registration form.

When do I book the framing inspection?

The City of Mississauga says to book the framing inspection once all the framing and electrical work is complete and the plumbing, electrical and HVAC rough-ins have already passed. Insulation cannot go in until the framing passes, so the wall cavities stay open until then.

How many additional residential units can a Mississauga lot have?

The City says an owner of a detached, semi-detached or town home property can build up to two additional residential units, or a fourplex. Which one is allowed on your lot depends on zoning, so check the City's property information tool before you design.

← All framing guides

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing crews framing on site in the Greater Toronto Area

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call Get a Quote