Quote-Ready Now Licensed & Insured
Home Addition Framing, framed on site by Timberr Framing
Custom Framing

Home Addition Framing

Home addition framing across Toronto, the GTA and the Golden Horseshoe, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from home addition framing

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm the issued permit, applicable approvals, survey controls and the approved existing-versus-proposed drawings, so you get a buildable set with bearing lines and open questions marked.
  2. Verify. Verify the new foundation's dimensions, elevation, anchor locations and relationship to the existing house before sill and floor framing, so you catch a dimensional conflict before it becomes a site delay.
  3. Set. Expose enough existing structure to verify the designed tie-in condition before removing a bearing wall, roof or floor element, so your loads land on the supporting structure in the designed order.
  4. Frame. Install new beams, posts, joists and floor sheathing with the specified bearing and support path, so your next layout starts from a stable control line.
  5. Coordinate. Frame addition walls, openings and concentrated-load posts while aligning the new floor and roof geometry to the approved elevations, so you can correct openings, blocking and service zones while access is clear.
  6. Release. Complete the designed old-to-new opening and roof connection without unapproved cuts to existing trusses or joists, so you get visible, documented work ready for inspection and handoff.
Home Addition Framing being framed on site by Timberr Framing

Ready to price home addition framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why Timberr is different on this scope

We measure the existing frame against the addition drawings before demolition commits the house to one solution. Tie-in conflicts, temporary support and bearing changes are identified while the engineer can still answer them cleanly.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed home addition framing work is backed by our workmanship warranty. The same team that reviews the risk remains accountable through the handoff.

Home Addition Framing by Timberr Framing
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
E Ericvia Google
Professional service, high-quality work, and attention to detail. Timberr Framing exceeded our expectations on both our addition and commercial framing projects!
L Luisvia Google
Timberr Framing did an amazing job with our addition framing, ensuring structural integrity and a perfect fit with the existing home.
How It Gets Built

More about home addition framing

Understanding home addition framing

The systems and conditions that change the work

The systems and conditions that change the work

A rear, side or upper-storey addition changes different existing supports; the approved structural design, not the label, determines beams, posts and foundation work. That means your engineer may need to settle the load path before material is ordered.

A same-level extension can use prescriptive Part 9 members only where species, grade, spans, spacing and loads fit the tables. That means your quote carries the matching member layout, connector schedule and site handling.

A wide connection to the existing house can require an engineered beam and posts because lintel and stud rules depend on opening width and supported load. That means you get the route supported by the drawings instead of a choice made from habit.

Roof framing can be site-framed or trussed; trusses cannot be cut unless the truss design permits the alteration. That means your following trades inherit that system's spacing, openings and limits.

What belongs in the scope

What belongs in the scope

A permit application must distinguish existing construction from proposed work and provide dimensioned drawings and structural information for the addition, so the home-addition boundary is fixed before award. Zoning, grading, conservation or heritage approvals can be applicable law that must be resolved before a building permit is issued. That means your quote can name exclusions and owner-supplied items instead of hiding them.

Addition floor area and storey count change the number and loading of floors, walls and roof assemblies to be framed, so measured home-addition quantities control the takeoff. The width and load of the opening into the existing house change beams, posts, temporary-work design and permanent bearing. That means you can compare the selected member schedule rather than a generic allowance. Upper-storey work changes access and the existing structure that must carry new loads, so home-addition coordination is visible before approval.

The mistake we want found before the work begins

The mistake we want found before the work begins

A new floor framed from the proposed elevation can miss the existing finished floor once real joist depth, subfloor and settlement are measured. That small difference becomes a permanent step or a rebuilt connection across the whole opening. We establish both elevations before the first tie-in member is cut.

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Loadbearing studs require Stud, Standard or No. 2 grade lumber, and installed lumber may contain no more than 19 percent moisture. That means your installed member must match the grade or product shown in the design. Floor joist end bearing is at least 38 mm unless ribbon-board support is used, which means you can verify the material condition before it is enclosed.

Beam end bearing is at least 89 mm unless a span-table note permits another value, which means your bearing and connection detail must preserve that capacity. Joists framed into the side of a wood beam require hangers, another accepted mechanical connector or a compliant ledger. That means you can trace the fastening requirement to the actual assembly.

Plans, sequencing, and site decisions

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario requires notice when Part 9 structural framing and HVAC ductwork and piping are substantially complete, which means your sequence must reach that visible hold point before finishes. Your municipality's addition permit guide identifies framing above the foundation, foundation walls and engineered structural content as permit-drawing subjects. That means you can plan the following trade around the stated response.

Approved plans and details govern the old-to-new opening; an unexpected existing condition requires design resolution before concealment. That means your mechanical and electrical work may have to be complete before the framing review. Window, roofing, cladding and interior trades inherit the framed elevations, openings and sheathing transitions, which means you avoid reopening work the municipality needed to see.

Planning the work across the GTA

Planning the work across the GTA

Ontario sets the building rules while the municipality administers the permit and inspection for the address. That means your approved set must settle a rear, side or upper-storey addition changes different existing before work is covered. Your site decides the delivery, storage and lifting route for that system. So you get a different sequence for a clear subdivision lot, a tight infill lane or an occupied commercial unit.

What to send for a useful quote

What to send for a useful quote

Request the issued permit set, survey, zoning confirmation, structural details and all revisions, which means you give the estimator the current design basis. Request photographs and measured information for the existing foundation, floor, walls, roof, services and proposed opening, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Home Addition Framing, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Home Addition Framing FAQ

Can my house or property take this home addition framing work?

Only the approved structural design can confirm that the house will carry the addition. We verify the field condition against that design before removing or loading existing members.

How disruptive will the home addition framing work be?

The open-house period depends on demolition, temporary support and weather protection at the tie-in. We sequence those exposures before the crew opens the existing envelope.

What is most likely to go wrong?

A new floor framed from the proposed elevation can miss the existing finished floor once real joist depth, subfloor and settlement are measured. That small difference becomes a permanent step or a rebuilt connection across the whole opening.

Who is accountable if the site does not match the drawings?

Timberr owns stopping, documenting and explaining the framing conflict. The engineer or designer approves structural changes, and we build the written answer instead of improvising inside your house.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a home addition framing quote

Send the current drawings, property address, permit status and target start. We will check the package around a rear, side or upper-storey addition changes different existing, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call