Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Load-bearing wall removal in Mississauga and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Mississauga lists "Interior alterations" among the projects that need a building permit. Its interior alterations notice explains the reason: under the Building Code Act, 1992, s. 8(12), a person may not make a material change to the plans on which a permit was issued without notifying the chief building official and obtaining authorization. A building exists in its current configuration because of the plans on file. So altering it materially is a deviation from them and requires authorization in the form of a building permit.
Taking out a wall that carries load is a material change. If you are not sure whether a particular wall is structural, treat it as structural until someone has checked.
Mississauga's drawings page strongly recommends working with a design professional such as an architect, a professional engineer or a qualified designer. It says drawings must show details such as materials, sizes, spans and dimensions. Must be uploaded to the ePlans portal as PDF files; secured or protected PDFs are not accepted. The page requires sealed drawings for non-residential and multi-residential properties. It does not set a stamp rule for a house, so confirm your own requirement with Mississauga Building.
Our practice is simpler: we ask for the engineer's drawings on every load-bearing removal. The Ontario Building Code (O. Reg. 332/12, Sentence 9.4.1.1.(1)) requires structural members and their connections to follow Part 9, good engineering practice, or Part 4 design.
A new beam over a wide opening, with posts landing on a floor system or footing below, is the kind of member where the load path should be on paper before anyone cuts. The beam, bearing and posts are the engineer's to size. We build what the drawing shows.
Mississauga says it usually takes about 7 to 10 business days to prescreen a building permit request, subject to request volumes. Once an application is complete, it says the first review may take 10 business days for a residential application. It lists an average of 7 weeks to process and issue a permit for a residential alteration to a detached or semi-detached house. Each resubmission cycle could add two or more weeks. Plan your demolition date after the permit, not before.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, plan on it. Mississauga lists interior alterations as permit work, and its notice explains that a material change to a building from the plans on file requires authorization in the form of a building permit. Confirm your case with Mississauga Building.
Mississauga strongly recommends a design professional. Its page requires sealed drawings for non-residential and multi-residential properties and does not state a stamp rule for a house. For a load-bearing wall we ask for the engineer's drawings, because the Code requires the beam and its connections to follow Part 9, good engineering practice or Part 4 design.
Materials, sizes, spans and dimensions. Mississauga says drawings show details of that kind and are submitted as unsecured PDF files through ePlans.
A stand-in structure that carries the load while the wall is out. It usually has a load-spreading member, braced posts and solid bearing below them. See our guide to shoring a load-bearing wall removal for what the plan should cover.
Mississauga lists an average of 7 weeks for a residential alteration to a detached or semi-detached house. It says prescreening usually takes about 7 to 10 business days, the first review of a complete residential application may take 10 business days, and each resubmission cycle could add two or more weeks.
Once the framing and electrical work are complete. Mississauga says insulation is not installed until the inspection has passed and the inspector looks for structural changes that match the permit drawings.
Not without checking. Mississauga advises that columns or beams should not be cut or drilled through without checking manufacturer specifications or consulting an engineer.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Mississauga. See all framing in Mississauga →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the address, the engineer's drawings or photos of the wall, permit status and target start. We will confirm the shoring plan, the beam and posts, and what is ready to price.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides load-bearing wall removal, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.
Press Esc to close
Ryan
Estimator