Second suite and in-law suite framing in Milton and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Milton framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from second suite and in-law suite framing in Milton

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm zoning eligibility, permit status, unit layout, existing-building classification and approved drawings before demolition or framing, so you get a buildable set with bearing lines and open questions marked.
  2. Verify. Measure ceiling heights under joists, beams and ducts before setting walls because the secondary-suite limits apply to the finished route and rooms, so you catch a dimensional conflict before it becomes a site delay.
  3. Set. Expose and verify existing beams, joists, posts, foundations and services affected by new walls or openings, so your loads land on the supporting structure in the designed order.
  4. Frame. Complete only the structural alterations shown in the approved design, preserving support beneath new beams and bearing walls, so your next layout starts from a stable control line.
  5. Coordinate. Frame unit boundaries, rooms, doors and service spaces to the approved dimensions, so you can correct openings, blocking and service zones while access is clear.
  6. Release. Install separation backing and fire blocking without leaving unplanned service penetrations, so you get visible, documented work ready for inspection and handoff.
Second Suite and In-law Suite Framing in Milton being framed on site by Timberr Framing

Ready to price second suite and in-law suite framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why put Timberr on this part of the build

We quote a basement suite from the architectural and structural information, identify missing decisions before mobilising, and keep changes tied to written direction, so you can compare a defined scope and know which revision controls the work.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed work is backed by our workmanship warranty, which means you can verify who stands behind the a basement suite handoff.

Second Suite and In-law Suite Framing in Milton by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Second Suite and In-law Suite Framing in Milton

Understanding second suite and in-law suite framing

What the crew checks in Milton

What the crew checks in Milton

Milton accepts residential permit applications electronically and checks completeness before full review. The permit holder or owner is responsible for arranging required inspections. Road-occupancy work zones and entrance permits use a separate roadway-permit process.

Milton states that a submitted application does not authorize construction, so the second-suite frame mobilizes only after permit issuance. Work affecting a designated heritage property can require a heritage-building permit. Secondary suites use Milton's residential permit path and remain subject to the address-specific approval set.

What belongs in the Milton site scope

What belongs in the Milton site scope

At the address, we verify suite layout, openings, ceiling constraints and separation details. We also confirm how studs, engineered members and occupied-site access will reach and move through the work area. The quote separates layout, structural changes, openings, separations, ceiling conditions and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.

The systems and conditions that change the work

The systems and conditions that change the work

A basement suite is constrained by foundation walls, beams, ducts and below-grade openings, while an upper-floor suite depends more heavily on floor-ceiling separation and stair access. That means your engineer may need to settle the load path before material is ordered.

A secondary suite is an additional dwelling unit within a house and follows the OBC provisions specifically written for that condition. That means your quote carries the matching member layout, connector schedule and site handling.

Mississauga separately permits additional units in locations such as basements, garages, upper floors and additions, subject to its municipal rules. That means you get the route supported by the drawings instead of a choice made from habit.

Walls and floor-ceiling framing separating units in a house with a secondary suite may use the continuous smoke-tight Type X gypsum alternative in 9.10.9.16(4). That means your following trades inherit that system's spacing, openings and limits.

Problems worth preventing before they disappear behind finishes

Problems worth preventing before they disappear behind finishes

Framing before measuring ducts can create a suite below the required clear height; verify finished clearances first. That means you do not inherit that condition after it is concealed. An unplanned service penetration can break the smoke-tight separation; coordinate routes and approved firestopping before cover. That means you can correct the load path or assembly while the work remains accessible.

Untreated bottom plates directly on ground-contact concrete lack the required separation, which means your approved repair is documented before the next trade arrives. We stop a conflict involving a basement suite because you need the designer's answer before an improvised fix becomes permanent.

Plans, sequencing, and site decisions

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Secondary-suite ceiling height must be at least 1.95 m, which means your installed member must match the grade or product shown in the design. Clear height under beams and ducting in a secondary suite must be at least 1.85 m, which means you can verify the material condition before it is enclosed.

Loadbearing studs require Stud, Standard or No. 2 lumber; non-loadbearing studs may use Stud, Utility or No. 3, which means your bearing and connection detail must preserve that capacity. Installed framing lumber must contain no more than 19 percent moisture, which means you can trace the fastening requirement to the actual assembly.

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario's Part 9 framing notice includes substantially complete structural framing and HVAC ductwork and piping, which means your sequence must reach that visible hold point before finishes. Mississauga requires plumbing, electrical and HVAC rough-ins to pass before its framing inspection, which means you can plan the following trade around the stated response.

Mississauga checks ceiling heights, rooms, windows, structural openings and fire blocking while the frame is uncovered. That means your mechanical and electrical work may have to be complete before the framing review. Mississauga schedules fire-separation inspection after framing, sound insulation, plumbing and heating but before cover, which means you avoid reopening work the municipality needed to see.

What to send for a useful quote

What to send for a useful quote

Request the address, zoning confirmation, intended unit arrangement, permit status and municipal registration requirements, which means you give the estimator the current design basis. Request approved floor plans, fire-separation details, exit information and mechanical layouts, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Second Suite and In-law Suite Framing in Milton, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Second Suite and In-law Suite Framing FAQ

Does second suite and in-law suite framing need a permit in Milton?

It depends on whether the scope is permit work. A new building, addition or renovation requires a Milton permit. Submission alone is not authorization to start.

What must be ready for the local inspection?

The issued permit package and the work for that inspection stage must be ready. The permit holder or owner must arrange every required Milton inspection.

Can Second Suite and In-Law Suite Framing materials or equipment use public space?

Only when the applicable municipal approval allows it. A road-occupancy work zone or entrance change uses Milton's separate roadway-permit process.

What should I send for a second suite and in-law suite framing quote?

Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs layout, structural changes, openings, separations, ceiling conditions and access plus the proposed route for studs, engineered members and occupied-site access.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a second suite and in-law suite framing quote in Milton

Send the current drawings, property address, permit status and target start. We will check the package around a basement suite, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call