Quote-Ready Now Licensed & Insured
Basement Framing in Toronto, Ontario, framed on site by Timberr Framing
Framing in Toronto

Basement Framing in Toronto

Basement framing in Toronto and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Toronto framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6744
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from basement framing in Toronto

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How a job runs, step by step

  1. Review the drawings and permit position. We read the plan, confirm whether a permit is in place or needed, and mark any bearing lines, columns, beams and ducts.
  2. Measure and mark the slab. We check the floor for level and moisture, set the layout lines from the plan and confirm the ceiling height under beams and ducts.
  3. Separate the wood from the concrete. The 0.05 mm polyethylene film or Type S roll roofing goes under bottom plates unless an exception applies.
  4. Frame walls, openings and bulkheads. Plates, studs, doubled studs at openings, blocking for fixtures and cabinets, and bulkheads sized to the duct and beam clearances.
  5. Fire block. Blocks go in at the heights and intervals the Code sets, using 38 mm lumber, gypsum, plywood or steel as the plan specifies.
  6. Open for the trades and the inspector. Plumbing, electrical and HVAC rough in while the frame is open. Toronto inspects the framing and rough-ins before insulation.
  7. Insulation, vapour barrier and handoff. The insulation and vapour barrier trade follows, then drywall, once the inspections that apply have been seen.
Basement Framing in Toronto being framed on site by Timberr Framing

Ready to price basement framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6744
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Basement Framing in Toronto

Understanding basement framing

Does finishing a basement in Toronto need a building permit?

Does finishing a basement in Toronto need a building permit?

It depends on what the work includes. The City of Toronto lists finishing a basement of a house as work that does not need a permit only if three things are true: the work does not include structural or material alterations, no additional dwelling unit is created. The work does not include the installation of new plumbing.

The same City page lists what does need a permit: structural or material alterations, which it describes as adding or removing walls (changing room sizes or uses) and new or enlarged windows and doors; installing or modifying heating or plumbing systems; excavating or constructing foundations; basement underpinning; a new basement entrance; and adding a second suite. Toronto also notes that zoning by-law compliance is required even where no permit is.

In practice, a new basement layout framed from bare concrete adds walls and changes room sizes. So we treat it as permit work and confirm with Toronto Building before we price it. If you are unsure, call the City on 311 with the address and the drawing.

What Toronto inspects on a basement frame

What Toronto inspects on a basement frame

Toronto publishes the stages at which it expects a call for inspection on small buildings. Three of them land on a basement frame: structural framing, at completion including the rough-in of plumbing and HVAC; fire separations, at completion of wall, floor and shaft separations and fire stopping, before interior finishes are installed; and insulation and vapour barrier, at completion and before interior services are installed. HVAC rough-in is inspected at completion, before insulation goes in.

The practical result is a sequence: frame, rough-in, inspection, insulation, inspection, then drywall. Closing a wall early means opening it again. We build the frame so the walls stay open and reachable until each stage has been seen.

Ontario Building Code points that shape a basement frame

Ontario Building Code points that shape a basement frame

These come from Part 9 of the Ontario Building Code, O. Reg. 332/12, read on e-Laws. Your designer or the Building Code itself controls the details of your project; this is what the framing crew builds around.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6744
Completed Basement Framing in Toronto, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Basement Framing FAQ

Do I need a building permit to frame a basement in Toronto?

Usually yes, if the layout adds or removes walls. Toronto lists finishing a basement as exempt only when the work has no structural or material alterations, creates no additional dwelling unit and includes no new plumbing. Adding or removing walls that change room sizes or uses is listed as a material alteration. Confirm with Toronto Building for your address.

Does the wood have to be kept off the concrete floor?

Generally yes. Sentence 9.23.2.3.(1) of the Ontario Building Code requires non-treated wood framing supported on concrete in contact with the ground to be separated from it by at least 0.05 mm polyethylene film or Type S roll roofing, with an exception where the member is at least 150 mm above the ground.

Where does the vapour barrier go on a basement wall?

On the warm side of the insulation. Article 9.25.4.3 requires the vapour barrier to protect the warm side of the assembly. It must have a permeance of not more than 60 ng/(Pa·s·m2) under 9.25.4.2, and the air barrier must be continuous throughout the basement under 9.25.3.1.(2).

Is fire blocking required in basement walls?

Often, yes. Article 9.10.16.2 requires fire blocks in wall assemblies, including furred spaces, at each floor level and at no more than 20 m horizontally and 3 m vertically, unless an exception in the same Article applies. Bulkheads and drop ceilings can also need blocks at their interconnections under 9.10.16.1.

How high does a basement ceiling have to be?

2 100 mm over at least 75 percent of the area. Table 9.5.3.1 allows the clearance to be reduced to 1 950 mm under beams and ducts.

What does Toronto inspect during basement framing?

Framing, fire separations, and insulation with the vapour barrier. Toronto lists structural framing at completion including plumbing and HVAC rough-in, fire separations before interior finishes, and insulation and vapour barrier before interior services. Ask your inspector about any extra stage for your permit.

Can you frame a basement for a second suite?

Yes, with the right permit. Toronto lists adding a second suite as permit work. We frame from the permit drawings for the suite, including any fire separation they call for.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6744
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a basement framing quote in Toronto

Send the address, drawing, permit status and target start. We will confirm what needs a permit, what the code requires of the frame, and what is ready to price.

(416) 236-6744

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6744

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call