Duplex framing needs a clean separation between two units that share one structure, so Timberr Framing frames the separation wall first as its own system, then builds the stacked or side-by-side load alignment around it. Service path planning keeps each unit's plumbing, electrical, and HVAC runs from crossing into the other unit's space.
Quotes shift with layout (stacked units versus side-by-side), separation wall length, and how many service paths need independent routing. Timberr sequences framing so each unit reaches its inspection stage cleanly, coordinating with the GC on timing so both units move through Ontario Building Code review without one unit's schedule dragging on the other.