Multiplex Framing in Aurora, Ontario, framed on site by Timberr Framing
Framing in Aurora

Multiplex Framing in Aurora

Multiplex framing in Aurora and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Aurora framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from multiplex framing in Aurora

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How our multiplex framing process works

  1. Request the quote. Send Timberr the current architectural and structural set, the address, the intended start window, and photos of retained construction. urora, call (416) 236-6674 when the drawings need explanation before upload.
  2. Review drawings and site. The review checks the unit matrix, stacked loads, shared exits, stairs, shafts, rated separations, service distribution, accessibility, and roof design. Timberr confirms scope, exclusions, access, temporary works, the lumber package, and interfaces with fourplex framing.
  3. Issue a detailed price and schedule. The quote identifies repeated floors and walls, demising assemblies, stairs, shafts, roof framing, sheathing, hardware, and staged materials. Assumptions, material responsibilities, equipment, readiness conditions, and the proposed crew window are written rather than left for site interpretation.
  4. Coordinate the build. One Timberr contact aligns the GC, architect, engineer, mechanical consultants, truss supplier, fire stopping, and phased inspections. The sequence accounts for delivery dates, preceding work, other trades, engineer reviews, and inspection hold points.
  5. Execute the framing. The accountable crew completes aligned bearing walls, demising lines, floors, stairs, service shafts, roof systems, openings, and sheathing. It checks layout and temporary stability while the adjoining firewall and party wall framing interface remains buildable.
  6. Prepare for inspection. Timberr checks load continuity, separations, egress, shaft dimensions, fire blocking, connectors, and each completed framing level before the stage is presented under the Ontario Building Code. Approved drawings and engineered details remain available, and work that must be seen is not covered early.
  7. Hand over cleanly. The closeout provides consistent unit dimensions, open service routes, protected common paths, cleared floors, and traceable deficiency closeout., Timberr removes offcuts, resolves in-scope deficiencies, and gives the GC or owner a clear area for the next scheduled trade.
Multiplex Framing in Aurora being framed on site by Timberr Framing

Ready to price multiplex framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why Timberr is different on this scope

We review the first unit as a production standard, then hold repetition to that approved condition. Bearing stacks, service zones and separation edges are checked together, with each revision tied to the units it affects.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed multiplex framing work is backed by our workmanship warranty. The same team that reviews the risk remains accountable through the handoff.

Multiplex Framing in Aurora by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Multiplex Framing in Aurora

Understanding multiplex framing

What changes the site plan in Aurora

What changes the site plan in Aurora

Aurora Building Division issues permits and conducts inspections; York Region is not the building-permit authority. Building, inspection and road-occupancy applications use the CityView portal. Applicable-law approvals must clear before a permit application is complete and issuable.

Aurora requires applicable-law approvals before a building permit can be issued, so the multiplex frame waits for complete approval. Larger additions in stable-neighbourhood areas can trigger site-plan and urban-design review. A second dwelling unit requires the applicable permit plus local zoning and registration compliance.

What belongs in the Aurora site scope

What belongs in the Aurora site scope

At the address, we verify unit layouts, bearing lines, openings and separation details. We also confirm the current municipal approval status and the route for lumber, engineered members and constrained-site deliveries. That route is checked without assuming municipal road space is available.

The quote separates unit count, structural changes, separations, openings, services and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.

The real variants and conditions that change the work

The real variants and conditions that change the work

A duplex, triplex or fourplex is selected by unit count and zoning. But unit count alone does not decide OBC Part 9 versus the applicable Parts 3 to 6 design path. So your engineer may need to settle the load path before material is ordered. Toronto permits up to four units in specified low-rise zones; Mississauga runs a separate framework, but neither changes the Part 9 size test.

Side-by-side units concentrate separation work in vertical walls under OBC 9.10.9.16, while stacked units add horizontal floor-ceiling separations on top. So a stacked layout carries more framed assembly at the same unit count. A unit with two or more storeys, including a basement, generally needs a 1 h separation from the rest of a Part 9 building. So your two-storey unit inherits a heavier separation than the unit beside it.

A secondary-suite conversion has its own OBC alternative using continuous, smoke-tight Type X gypsum protection that cannot be copied onto a purpose-built multiplex. So a converted basement apartment and a new-build fourplex get framed and priced differently at the same unit count. Converting a house also adds OBC Part 11 coordination new construction skips.

Conventional dimensional lumber, I-joists, metal-web wood joists and plated wood trusses are all possible structural categories. But an engineered system locks you into that supplier's layout and connectors once ordered. So switching systems mid-project means new drawings, not a field substitution.

The mistake we want found before the work begins

The mistake we want found before the work begins

One unplanned duct crossing a rated unit boundary can force the same wall or floor edge open in every repeated unit. The framing quantity is not the real loss; the repeated inspection and trade resequencing is. We settle penetration zones before the first assembly is copied across the building.

Plans, sequencing, and site decisions

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Loadbearing studs go in as Stud, Standard or No.2 grade lumber. Non-loadbearing studs can use Stud, Utility or No.3, so the grade stamp actually matches what that wall carries. Framing lumber has to arrive at 19 percent moisture content or less, because wet lumber shrinks and twists once enclosed behind drywall.

Stud size and spacing depend on unsupported height and the floors and roof loads a wall supports. Studs run continuous through a full storey with no site splicing. So a stacked unit gets a heavier stud schedule than the single-storey unit beside it. Beam ends need at least 89 mm of even, level bearing. A joist framed into a beam needs a hanger, connector or compliant ledger. So the load transfers as the design intends.

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario requires notice once your Part 9 structural framing and HVAC ductwork are substantially complete, while a multiplex outside Part 9 hits its notice point at substantial completion of structural framing and HVAC rough-in instead. Ontario prescribes an inspection response within 2 days of that notice, excluding weekends, holidays and closed-office days. So a package ready on a Thursday should not sit waiting long.

Fire-separation work can carry its own OBC inspection stage, separate from structural framing, so we confirm the local schedule before covering any assembly. Your drywaller and firestopping trades inherit the stud separation lines we leave behind, so what we hand off is what they build from.

What to send for a useful multiplex framing quote

What to send for a useful multiplex framing quote

Send the address, approved unit count, occupancy, zoning confirmation and permit status, plus the coordinated architectural, structural, fire-separation and mechanical drawings, beam and post schedules, with every revision. Include floor and roof layouts, truss drawings and any engineered-member details, and tell us who supplies fire blocking, firestopping backing and separation-board installation. For a conversion, add measured existing conditions and the OBC Part 11 design analysis, so nothing gets assumed.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Multiplex Framing in Aurora, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Multiplex Framing FAQ

Will Timberr take on multiplex framing in Aurora?

Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Aurora work from its GTA and York Region service base, with mobilisation tied to the booked address.

Does this work need a building permit from Aurora?

It depends on whether the proposed scope is permit work. Aurora Building Division issues the permit after applicable-law and municipal review are complete.

What must be ready for the municipal inspection?

The issued permit package and the work assigned to that inspection stage must be ready. Book the required Aurora inspections through CityView and follow the stages on the issued permit.

What can delay the crew start in Aurora?

Unresolved access approval or an incomplete material route can delay mobilisation. Road-occupancy applications also use CityView; the site still needs a measured delivery and storage plan. The quote also needs unit count, structural changes, separations, openings, services and access.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a multiplex framing quote in Aurora

Send the current drawings, the property address, permit status and the start window you are working toward. We will check the package around your duplex, triplex or fourplex, flag any missing beam, post or fire-separation decision, and give you a scope you can actually price against.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call