Floor systems decide how a building feels underfoot for decades, so Timberr Framing runs joist layout to the engineered span tables rather than spacing by habit, sizing beams and hangers to the actual load path instead of the nearest available lumber. Openings for stairs, mechanical chases, and skylights get framed without weakening the surrounding structure.
Quotes shift with span, joist spacing and depth, and how many openings interrupt the floor plane. Timberr keeps the subfloor tight and squeak-free by controlling panel layout and fastening schedule, and coordinates with the structural engineer on hanger and connector specs so the finished floor system holds its span for the life of the building.
Timberr Framing schedules floor system installation around the GC's overall shell sequence, coordinating with the structural engineer on hanger and connector details so the floor is ready for the wall framing that follows without delay.