Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Pool house framing in Milton and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Milton accepts residential permit applications electronically and checks completeness before full review. The permit holder or owner is responsible for arranging required inspections. Road-occupancy work zones and entrance permits use a separate roadway-permit process.
Milton states that a submitted application does not authorize construction, so the pool-house frame mobilizes only after permit issuance. A change to grade, fill or drainage can require a site-alteration permit before site work begins.
At the address, we verify slab controls, openings, moisture exposure and roof geometry. We also confirm how lumber, headers, trusses and yard access will reach and move through the work area. The quote separates footprint, openings, roof form, spans, moisture exposure, finishes and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.
An unconditioned equipment cabana differs from a conditioned pool house with a washroom, kitchen or change facilities. So your plumbing and mechanical scope changes with the use you actually want. The framing still carries the same roof, wind and snow loads either way.
Slab-on-grade, crawlspace and framed-floor designs use different foundations and moisture details under OBC 9.15, 9.16, 9.18 and 9.23. So the foundation on your drawings decides how we frame the floor above it. A slab removes floor framing from the scope; a crawlspace or framed floor adds joists and a moisture-managed underfloor space.
A flat roof, low-slope roof and conventionally sloped roof require different drainage and membrane details under OBC 9.26. So the roof shape on your elevations sets the framing pitch. Get the slope wrong on a low-slope roof and you are framing a leak, not a design choice.
Large glazed openings and folding doors change header, bracing and water-control details under OBC 9.23.10, 9.23.13 and 9.27. So a wide slider or a folding wall moves your header schedule off the standard opening table. Coordinate that header size with your supplier before framing starts.
A roofed outdoor bar or change shelter may have open walls but still requires designed support, anchorage and roofing under OBC 4.1, 9.23 and 9.26. So an open structure is not a lighter framing job. The posts and roof still need the same engineered load path as an enclosed building.
Treating the pool enclosure permit as approval for the cabana is a real failure on these jobs in Toronto. The prevention is obtaining the separate accessory-building approval before framing starts, so you are not stopped mid-build for a permit you assumed you already had. Laying out from a fence rather than a current survey is another; we use verified property and setback information instead. So your structure does not end up sitting inside a setback it was never allowed to occupy.
Placing doors without checking pool-enclosure access conditions creates a coordination failure between your building and your pool installer. So we coordinate the building and enclosure plans together before anything is framed.
Using interior-only materials at wet exterior interfaces is a durability failure under OBC 9.23.2.3 and 9.27; we follow the approved durability and envelope details instead. So a change-room wall does not rot from the inside out. Framing before service and slab penetrations are coordinated forces rework later, so we fix routes and openings on approved drawings first.
Wood wall, floor and roof members follow the applicable Part 9 span, spacing, bearing, bracing and fastening provisions under OBC 9.23. But only where the Part's prescriptive limits actually apply to your design. Exterior wood in locations exposed to moisture or near grade needs the decay-protection and clearance provisions in OBC 9.23.2.3 and 9.27. So the sill plate closest to your pool deck does not get treated the same as an interior stud.
Guards and their connections get detailed wherever the elevation and access conditions require them under OBC 9.8.8. So a raised deck or a change in grade around your pool house gets a guard sized to the drop, not an afterthought. Toronto's accessory-structure guide also asks for concrete floor-slab strength and reinforcement details, so the slab your framing sits on has to match what was submitted for approval.
The permit holder is responsible for notifying the municipality for required inspections. Footings, foundations, structural framing, insulation and plumbing can each create separate inspection hold points. So your schedule needs room for more than one visit. Pool installers inherit the approved building setbacks, grade relationship and enclosure access we leave behind, so a setback error in our framing becomes their delay, not just ours.
Plumbing and mechanical trades inherit the framed service spaces, drain routes and equipment clearances under OBC 9.31 and 9.33. So we frame those spaces to the sizes on the approved drawings, not a rough guess.
Electrical work near the pool sits outside a generic framing detail and gets coordinated with the applicable authority separately. Envelope trades inherit the roof slopes, opening flashings and wall-to-slab moisture transitions under OBC 9.25 to 9.27. So the roofer and sider who follow us start from a shell already detailed to shed water.
Send your current survey, site plan, zoning summary, setbacks, grade and pool-enclosure plan, so the estimate is built on the same design basis the city is reviewing. Include floor plans, elevations, sections, structural details, and your foundation, slab, wall, floor, roof and guard details, so your takeoff reflects the scheduled members instead of an allowance.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
It depends on whether the scope is permit work. A new building, addition or renovation requires a Milton permit. Submission alone is not authorization to start.
The issued permit package and the work for that inspection stage must be ready. The permit holder or owner must arrange every required Milton inspection.
Only when the applicable municipal approval allows it. A road-occupancy work zone or entrance change uses Milton's separate roadway-permit process.
Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs footprint, openings, roof form, spans, moisture exposure, finishes and access plus the proposed route for lumber, headers, trusses and yard access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Milton. See all framing in Milton →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, property address, permit status for both the accessory building and the pool enclosure, and the start window you are working toward. We will review the package, flag any missing bearing, opening or approval, and give you a scope you can actually price against.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides pool house framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.