Quote-Ready Now Licensed & Insured
Post-and-Beam Framing in Burlington, Ontario, framed on site by Timberr Framing
Framing in Burlington

Post-and-Beam Framing in Burlington

Post-and-beam framing in Burlington and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Burlington framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from post-and-beam framing in Burlington

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm structural drawings, reactions, member schedule, post centres, bearing details and connection schedule, so you get a buildable set with bearing lines and open questions marked.
  2. Verify. Verify that each post load has a continuous path to a footing or designed supporting member, so you catch a dimensional conflict before it becomes a site delay.
  3. Set. Check foundation, anchor and bearing elevations before fabrication or cutting, so your loads land on the supporting structure in the designed order.
  4. Frame. Receive members with their grade marks, product identification and protection requirements intact, so your next layout starts from a stable control line.
  5. Coordinate. Set posts centrally on their designed supports and provide required lateral restraint, so you can correct openings, blocking and service zones while access is clear.
  6. Release. Set beams with even, level bearing and install specified connectors, bolts, hangers or ledgers, so you get visible, documented work ready for inspection and handoff.
Post-and-Beam Framing in Burlington being framed on site by Timberr Framing

Ready to price post-and-beam framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why put Timberr on this part of the build

We quote a concealed built-up beam, exposed timber frame and engineered glulam frame from the architectural and structural information, identify missing decisions before mobilising, and keep changes tied to written direction, so you can compare a defined scope and know which revision controls the work.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed work is backed by our workmanship warranty, which means you can verify who stands behind the a concealed built-up beam, exposed timber frame and engineered glulam frame handoff.

Post-and-Beam Framing in Burlington by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Post-and-Beam Framing in Burlington

Understanding post-and-beam framing

What the crew checks in Burlington

What the crew checks in Burlington

Burlington requires Pre-Building Approval before the building-permit submission for house additions. That approval can coordinate zoning, grading, drainage and tree review. Materials or equipment kept on a City road require a road-occupancy permit.

Burlington requires inspection before construction is covered or carried past the applicable stage, so the post-and-beam frame stays open until its stage clears. A Grading and Drainage Clearance Certificate can be required before permit issuance on a residential lot with ten or fewer units.

What belongs in the Burlington site scope

What belongs in the Burlington site scope

At the address, we verify post locations, beam elevations, bearing and connections. We also confirm how heavy members, connectors and lifting access will reach and move through the work area. The quote separates member size and weight, spans, connections, finish, lifting and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.

The systems and conditions that change the work

The systems and conditions that change the work

A concealed built-up beam, exposed timber frame and engineered glulam frame have different appearance, moisture, connection and fire-design requirements. That means your engineer may need to settle the load path before material is ordered.

A beam supporting floor joists can receive them on top or at its side. But side framing needs the prescribed or designed support, which means your quote carries the matching member layout, connector schedule and site handling.

Exterior posts and beams require durability, drainage and exposure details not inferred from interior framing provisions. That means you get the route supported by the drawings instead of a choice made from habit.

A post beneath a point load differs from a decorative post that carries no structural load, which means your following trades inherit that system's spacing, openings and limits.

Problems worth preventing before they disappear behind finishes

Problems worth preventing before they disappear behind finishes

Failure: placing a post without a verified support below. Prevention: trace every reaction to a footing or designed transfer member, which means you do not inherit that condition after it is concealed. Failure: reducing beam bearing to fit adjacent work. Prevention: preserve the approved bearing length and support condition, which means you can correct the load path or assembly while the work remains accessible.

Failure: staggering built-up beam joints without following the permitted locations. Prevention: use the approved joint layout, which means your approved repair is documented before the next trade arrives. We stop a conflict involving a concealed built-up beam, exposed timber frame and engineered glulam frame because you need the designer's answer before an improvised fix becomes permanent.

Plans, sequencing, and site decisions

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Part 9 beams require even and level bearing, with at least 89 mm end bearing unless the applicable span-table note states otherwise. That means your installed member must match the grade or product shown in the design. Individual members in a nailed built-up wood beam must be at least 38 mm thick and installed on edge. That means you can verify the material condition before it is enclosed.

A butt joint in a built-up beam generally occurs over a support, subject to the continuous-beam quarter-point provisions. That means your bearing and connection detail must preserve that capacity. The prescriptive double-row nailing option for 38 mm built-up beam members uses nails at least 89 mm long at no more than 450 mm spacing in each row. That means you can trace the fastening requirement to the actual assembly.

The hold point and the trades waiting after it

The hold point and the trades waiting after it

The permit holder is responsible for notifying the municipal building department at required inspection stages, which means your sequence must reach that visible hold point before finishes. Footing, anchor, post, beam and connector work should remain visible until the applicable inspection is complete, which means you can plan the following trade around the stated response.

Floor and roof trades inherit beam elevation, crown orientation where specified, connector installation and opening locations. That means your mechanical and electrical work may have to be complete before the framing review. Exterior-envelope trades inherit penetrations, flashings and continuity around exposed structural members, which means you avoid reopening work the municipality needed to see.

What to send for a useful quote

What to send for a useful quote

Structural plans, member and reaction schedules, connection details and revisions, which means you give the estimator the current design basis. Footing, foundation, anchor and bearing elevations, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Post-and-Beam Framing in Burlington, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Post-and-Beam Framing FAQ

Does post-and-beam framing need a permit in Burlington?

It depends on whether the scope is permit work. For a house addition, Burlington requires Pre-Building Approval before the building-permit submission.

What must be ready for the local inspection?

The issued permit package and the work for that inspection stage must be ready. Keep the approved drawings and permit card on site. Do not cover work or move beyond the listed stage before inspection.

Can Post-and-Beam Framing materials or equipment use public space?

Only when the applicable municipal approval allows it. A road-occupancy permit is required when construction materials or equipment stay on a City road.

What should I send for a post-and-beam framing quote?

Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs member size and weight, spans, connections, finish, lifting and access plus the proposed route for heavy members, connectors and lifting access.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a post-and-beam framing quote in Burlington

Send the current drawings, property address, permit status and target start. We will check the package around a concealed built-up beam, exposed timber frame and engineered glulam frame, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call